Infrastructure Projects
The Village manages a variety of infrastructure improvement projects. This year's infrastructure program will include roadway resurfacing, spot sidewalk and curb replacement, and bringing pedestrian crosswalks and corners into compliance with requirements set forth in the Americans with Disabilities Act (ADA). In an effort to provide information about the progress of each project, web pages have been developed to provide basic information such as start and completion dates, the project location, and a description of the project. These pages will also provide regular updates as construction commences.
Click here to receive email updates about ongoing infrastructure projects.
2024 Infrastructure Program
Project Name |
Location |
Status |
---|---|---|
2024 Roadway Resurfacing and Watermain Replacement Program |
Estimated Completion: December 2024 | |
Estimated Completion: Fall 2023 | ||
Devon Avenue Improvement Project |
Map |
Estimated Completion: Fall 2025 |
Pratt Avenue Bicycle Lane Improvements |
Estimated Completion: Fall 2025 |
If you have any questions about these projects, please contact the Public Works Department at 847-675-0888. Please view the Infrastructure Improvement Plan (PDF).
On February 6, 2018, the Village President appointed an Ad-Hoc Infrastructure Committee (“Committee”) to review and provide a recommendation regarding a draft infrastructure improvement plan that was presented to the Village Board by Village staff at a workshop on November 30, 2017. The Committee met on four occasions to review the proposed improvement plan and funding model. On May 14, 2018, the Committee voted to approve the recommendation outlined in the report (PDF). On June 19, 2018, the Village Board reviewed and accepted the Committee’s recommendation. Over the next 10 years, the Village will be working to make various improvements including resurfacing all of the residential streets and replacing various water mains. Staff and the Village Engineer have established a draft 10-year plan that identifies when each street and water main will be improved. This plan will be evaluated and updated on an annual basis depending on the need and available funding. View the draft of the 10-year plan dated December 14, 2018 (PDF).
Infrastructure Improvement Plan Progress
The 2022 Infrastructure Program includes resurfacing of 3.58 miles of roadway. The table below provides a status of the Village’s infrastructure improvement goals at the start and end of the 2022 construction season.
Program |
Goal |
Progress at End of 2021 (Year 3 of 10) |
Estimated End of 2022(Year 4 of 10) |
---|---|---|---|
Roadway Resurfacing | Resurface all 41 miles of Village roads | 11.02 miles resurfaced | 3.58 miles resurfaced
36% of goal |
Water Main Replacement | Replace all water mains rated as “poor” and 15% of water mains rated as “fair” and installed in the 1920s | 2.15 miles replaced
|
0 miles replaced
17.2% of goal |
Preliminary Environmental Impacts Determination (PEID) - Lead Service Line Replacement
The IEPA has prepared a project summary and environmental assessment (PDF) to assist the Village in complying with the public notice requirements for the the Lead Service Replacement Project , IEPA Public Water Supply Loan Program (PWSLP) Project Plan (PDF).
-